Lodgepole, Sequoia National Park, California.
The job site location is approximately 23 miles from the Sequoia National Park Entrance Station, Three Rivers, CA; this will be the base of operations and the approximate location of the job site trailer.
This project rehabilitates the Clover Creek wastewater disposal system damaged by the KNP Fire.
Work includes:
Operational Constraints:
Period of Performance:
The project timeline is from approximately July 2026 through approximately November 2026. Exact dates of performance have yet to be determined and are dependent upon start of construction activities.
The CMR(s) assigned to this task order shall be able to perform the duties described below:
General Description of Required Services
All work performed on the park facilities and within the park shall be undertaken with utmost care to ensure respect and preserve the natural and cultural resources. Work shall minimize impacts to park resources and shall comply with all contract and project permit requirements regarding resource protection and mitigation measures.
Work shall minimize disruption of on-going NPS operations and facility maintenance activities within the park. The CMR is responsible for coordinating the Construction Contractor’s efforts with Park Staff's daily operations.