Gateway National Recreation Area Apply Preventative Maintenance Treatment to Hartshorne Ave
The project consists of pavement preservation to a 4.3 mile section of Hartshorne Drive, and a 1 mile section of Atlantic Drive. All work will be performed by contract labor. Contractor will surface mill and repave these park roads to preserve the current pavement system. Other paving work includes partial and full depth patching; asphalt crack sealing and crack filling; replacing metal guardrail sections; installing shoulder aggregate; replacement of signs; installing pavement markings; and other roadway preservation project related tasks as described in the project construction drawings and specifications.
Period of Performance:
Anticipated dates are August 18, 2026, until January 11, 2027. Exact dates of performance have yet to be determined and are dependent upon start of construction activities. This time frame accounts for but does not include winter construction shutdowns.
CMR Resumes must show:
Education and/or professional qualifications:
Construction Management:
Construction Inspection Tasks:
On-site Control
Safety
Documentation
Meetings
Inspection
Sampling and Testing
Test performed
Field sample ID number
Specification minimum requirements
Tested value
Pass / Fail criteria based on specification requirements
Reports
Payroll
Progress Payments
Project Closeout
Technical Tasks
Estimating
Project Schedule
Public Relations Photography
Office Services
Project Management Software
Submittals
Asphalt Testing
Structural Tests and Special Inspections