Demolition of the existing Yampa District Maintenance building, which has been condemned for structural failure. Demolition will include hazardous material mitigation. Demolition also includes any site elements such as existing shed buildings, paving, utilities, or other on-site items that must be removed to allow for the new construction activities outlined in the contract documents. Two existing metal buildings will remain and are not to be demolished.
A new Yampa District Multi-Operations building and all associated site and utility improvements as outlined in the contract documents. The new one-story building includes administrative office space and an adjoining high-bay drive through maintenance, fire, and operations vehicle garage space.
Site work includes all utility improvements needed to serve the new building, parking and paving surfaces, site drainage, fence repair, security gate installation, and a vehicle/boat wash station. Notable site improvements included in the project are water tank, communication system fiber optic, generator, and radio tower.
Improvements to the existing sewer system include removal of existing lift station wet well and pump and installation of a new duplex pump lift station. Replacement of a segment of existing sewer line between the new Yampa District Multi-Operations building and the existing Visitor Center.
Qualification:
Candidates should be able to provide the following to be considered for this position: